Landing

Advancing Complex Analysis Challenges

With Smarter Solutions

Why Choose Us?

We work closely within the aerospace, infrastructure, manufacturing, marine,
nuclear, oil and gas, petrochemical and renewable energy sectors.

Years of hand on experience

Impressive track records

Passion for numerical analysis

About Us

Founded in 2012, we are passionate about what we do the best–advanced simulation based engineering analysis.

Vekthor consists of highly competent professionals with years of hands on experience. We have extensive experience analysing structures and equipments using various design codes such as ISO 19900 series, DNV-GL, NORSOK, ASME BPVC, PED and many more.

Services

We boast an impressive track record on skills and services we have offered to our customers. We offer our services to most of the engineering , scientific and research based industries.

We work closely within the aerospace, infrastructure, manufacturing, marine, nuclear, oil and gas, petrochemical and renewable energy sectors.

Simulation Based Analysis

Our advanced engineering analysis capabilities are developed within simulation based analysis.

We utilise some of the most powerful Finite Element Analysis (FEA), Computational Fluid Dynamics (CFD) and Multibody Dynamics (MBD) tools available in the market.

Specialisations

Mechanics

Fluid

Thermal

Acoustic

Motion

Reference

Redundancy analysis for Donghea 1 offshore jacket structure

The Donghea 1 offshore jacket structure has been operating since 2004 in the Donghea 1 natural gas field, supporting a production facility in the East Sea, offshore of Ulsan, Korea.

Degree of Bending (DOB) input for RBI sensitivity study on South Arne lattice tower

As part of the on-going work on the South Arne platform, which include updates of the fatigue and Risk Based Inspection (RBI) analyses, it is judged relevant to revisit a number of the basic variables forming basis for the RBI analyses.

Ship Collision and Deterministic Fatigue Analyses in New Fender in Tyra West B

Ship collision analyses and deterministic fatigue analyses are carried out for the new fender in Tyra West B platform in Tyra Field, located in the Danish sector of the North Sea. This is part of the Tyra Future Development Project.

Exhaust stack for offshore processing facility

Tapis Enhanced Oil Recovery (EOR) and Rejuvenation Project involves integrating utilities…

Blast load analysis on safe habitat

Safe habitat consist of portal frame structure and blast panel walls are subjected to military…

Fatigue analysis on dehydration adsorber

The Calcasieu Pass LNG Export Terminal Project involves development of export facility…

ENQUIRY FORM

It’s Easy To Get Started